Maersk Guinée
A 6 kW system that had become too small, outages on the access control, cameras and network, and an electrical panel that needed rework. We audited the building, expanded the solar array to 16 kWp, separated the critical circuits, brought the protection devices up to standard and automated the generator. Essential equipment now stays powered during power cuts.